Project Gallery

Work that's still standing.

A selection of the foundations, sites, structures, and infrastructure Baseworks has self-performed. Filter by sector to see how we deliver in your market.

540+Projects since 1986
$2.1BPut in place
6States served

Aurora, CO2024

Cole Ridge Data Campus — Phase II

Client: Northvault Digital Infrastructure

Mat foundation and 412 augercast piles for a 28 MW hyperscale data hall, including embedded ductbank and seismic-isolated equipment pads.

412
Augercast piles
9,800
CY concrete
0
Lost-time inj.
Commerce City, CO2023

Río Seco Interchange Reconstruction

Client: Colorado DOT — Region 1

Drilled-shaft foundations and cast-in-place abutments for a four-span diverging-diamond interchange built under live traffic.

64
Drilled shafts
11mo
Schedule
1.2M
Vehicles/day
Buena Vista, CO2024

Granite Fork Hydro Spillway

Client: High Plains Water Authority

Mass-concrete spillway training walls and stilling basin with rock anchors, cofferdam, and dewatering for a 1940s dam rehabilitation.

22,000
CY mass conc.
180
Rock anchors
38ft
Cofferdam
Denver, CO2022

Foundry District Steel Bridge

Client: City of Denver Public Works

Fabrication and erection of a 240-ft weathering-steel pedestrian bridge, including caisson foundations and a single-night rail closure lift.

240ft
Main span
186t
Fab. steel
1
Night lift
Carlsbad, NM2023

Permian Gateway Compressor Station

Client: Sundial Midstream Partners

Full site development, reinforced equipment foundations, and pipe-rack steel for a natural-gas compressor station on expansive soils.

47ac
Site graded
31
Equip. pads
640t
Pipe-rack steel
Colorado Springs, CO2025

Summit Vista Medical Tower

Client: Cordera Health System

Deep mat foundation and post-tensioned podium for a 9-story acute-care tower, sequenced around an operating hospital campus.

9
Stories
6,400
CY mat pour
72hr
Single pour
Why owners come back

Repeat clients are our real portfolio.

More than two-thirds of our annual revenue comes from owners and general contractors we've built for before. On heavy-civil work, that kind of trust is earned one incident-free, on-budget turnover at a time.

  • Single-source accountability. One contract, one superintendent, one party responsible for the result.
  • Schedule certainty. Owned crews and equipment mean we don't wait on a subcontractor's backlog.
  • Documented quality. Every shaft, pour, and weld carries an inspection record you can audit.

Your project could be next on this page.

Start the conversation